Complete rehabilitation of the building consisting on the repair and strengthening of pillars downstairs, running new reinforced concrete floor and repair hanging beams. Performing in façade with straps and repair perimeter beams, replacement of pavement terraces including placing aluminum drip edge to prevent runoff Cranes, replacing ceramic in balconies and latticework deck waterproofing copolymers in aqueous dispersion and coating application specific waterproof exterior stone facades.
, ()